Harrison Lake Project
Vertical Loop
![]() |
The vertical loop requires drilling to install the loop between 200 and 300 feet deep. |
![]() |
Project Description
Vertical loop installed into new construction by True Green Geothermal.
![]() |
The vertical loop requires drilling to install the loop between 200 and 300 feet deep. |
![]() |
Vertical loop installed into new construction by True Green Geothermal.